Document Number CLNR-L125

Date Posted 18-Dec 2014

CLNR Trial Analysis: Capacitor Bank Autonomous and Single + GUS Voltage Control

Overview

The work detailed in this document is conducted using the IPSA2 models of the Denwick network to evaluate the capability of Hedgeley Moor Mechanically Switched Capacitor Bank in accommodating low carbon technologies following the deployment of the GUS Active Network Management system. This has been achieved using validated network models and a combination of real load and generation data from the Customer Led Network Revolution (CLNR) project.

 