This dataset forms part of a comprehensive set of results derived from the CLNR project’s network technology trials. The data is presented in an open and useable format. Use the button oppostite to download and save the file.

Description: Network trials dataset showing performance of Electrical Energy Storage EES1 – 2.5MVA / 5MWh being used for powerflow management.
Purpose: To ensure the dataset from the EES1 network trials is shared with other DNOs and interested parties. This dataset also support the VEEEG analysis and reports produced by Newcastle University. EES1 Autonomous and Single + GUS Powerflow Management.
Site Location/s: Rise Carr
Network Type: Urban
Data Source: Flexible Data Warehouse & Historian
Data Set Length: 11 days (30th May – 9th June)