Document Number CLNR-L252

Date Posted 22-Dec 2014

Costs Analysis Report: Real Time Thermal Rating

Overview

This report is a detailed breakdown of costs attributed to the design, modification and installation of thermal monitoring systems  deployed for the CLNR project and applied to;

  • Primary and secondary transformers,
  • Extra high, high and low voltage underground cables, and
  • Extra high and high voltage overhead lines.
  • Integration of all systems into the control scheme

The cost categories have been chosen to best illustrate the areas of work undertaken to safely install and commission the equipment on a UK DNO owned substation or conducting asset and to incorporate and trial it into the control scheme.