Report on CLNR Industrial & Commercial Demand Side Response Trials
Overview
This report discusses the learning gained from the Spring 2014 demand side response (DSR) trials with industrial and commercial (I&C) customers for the Customer-Led Network Revolution (CLNR) project.
The solution trialled was a direct control proposition which required industrial and commercial (I&C) customers to adapt their energy usage patterns upon request to create a controllable power flow. The methods employed by the customers included shifting load to another time outside the control period or utilising on-site generation to supply their load during the control period.
This is the second set of trials undertaken with I&C customers for CLNR, details of the learning from the first set of trials can be found in the document; Initial report on industrial and commercial demand side response trials.