In order to calculate the cost benefit of the CLNR project we have developed new solution templates based on the work of the Transform Model but populated using real data from the CLNR trials. | CLNR Solutions Templates | View >> |
This report contains the results of an investigation into the impact of the Common Distribution Charging Methodology (CDCM) on 2054 Industrial and Commercial (I&C) customers from across the Northern Powergrid network areas. | April 2010 Tariff Reform Analysis; Introduction to the Common Distribution Charging Methodology (CDCM) | View >> |
This paper provides a synopsis of the research findings produced by the social science team at Durham University in collaboration with the engineering research team at Durham and Newcastle Universities | SME Customers: Energy Practices and Flexibility | View >> |
| CLNR Test Cell Protocol | View >> |
This document describes the proposed approach to voltage control on Northern Powergrid’s HV and LV distribution network. | Voltage Control Policy: Proposals for a Voltage Control Policy from CLNR Learning | View >> |
| CLNR Learning Credits System | View >> |
Six monthly report; progress to date & routes to effective delivery, Dec 2014 | Progress report 8 | View >> |
This is a simple xls. tool can be used to calculate, on a scheme-by-scheme basis, an approximate ceiling price for demand side response | DSR Ceiling Price Calculator | View >> |
April 2010 Tariff Reform Analysis for the North East & Yorkshire regions | Datasets: Business (I&C) Impact of the 2010 Tariff Reform North East & Yorkshire | View >> |
Using the learning from the project, this report makes recommendations for a cost-effective Business As Usual (BAU) monitoring strategy which would provide data for the purposes of network planning, design and control in a cost effective manner | Enhanced Network Monitoring Report | View >> |
| CLNR Trial Analysis: EES1 and EAVC1 with GUS Voltage Control | View >> |
| CLNR Trial Analysis: HV Regulator Autonomous and Single and GUS Voltage Control | View >> |
| CLNR Trial Analysis: Collaborative Voltage Control on HV and LV Networks | View >> |
| CLNR Trial Analysis: EES3 Autonomous Voltage Control | View >> |
Enhanced profiling of domestic customers electric hot water immersion heating & storage heating | Dataset (TC2aHW+SH): Enhanced profiling of domestic customers electric hot water immersion heating & storage heating | View >> |
Enhanced profiling of domestic smart meter customers with electric hot water immersion heating | Dataset (TC2aHW): Enhanced profiling of domestic customers with electric hot water immersion heating | View >> |
Monitoring SME customers with restricted hours tariff and customer override | Dataset (10b): SME customers with restricted hours tariff and customer override | View >> |
Monitoring of SME smart meter customers (enhanced) on a 3-rate Time-of-Use tariff | Dataset (TC9b): SME smart meter customers on time of use tariffs | View >> |
Enhanced monitoring of customers’ overall consumption at meter level, and monitoring of disaggregated loads beyond the meter, comprising in excess of 50% of on-site consumption | Dataset (TC2b): Enhanced profiling of small and medium sized enterprise (SME) customers | View >> |
A review of active network/smart grid trial design and existing relevant active network management trials and pilot programs | Overview of Network Flexibility Trial Design for CLNR | View >> |