Document Number Document Title Date View Document
CLNR-L117CLNR Trial Analysis: I&C DSR for Powerflow Management23-Dec 2014View >>
CLNR-L130CLNR Trial Analysis: RTTR for Secondary Transformers23-Dec 2014View >>
CLNR-L126CLNR Trial Analysis: Tapchanging Secondary Transformer Automonous and GUS Voltage Control23-Dec 2014View >>
CLNR-L127CLNR Trial Analysis: EHV and HV for Real Time Thermal Rating Trials23-Dec 2014View >>
CLNR-L255NPADDS Prototype Functionality and Benefits Case23-Dec 2014View >>
CLNR-L155NPADDS Enduring Specification23-Dec 2014View >>
CLNR-L161Operational Guidance and Training Requirements: Electrical Energy Storage Systems22-Dec 2014View >>
CLNR-L158Operational Guidance and Training Requirements: Trials of Secondary Transformers with Integral OLTC22-Dec 2014View >>
CLNR-L156Operational Guidance and Training Requirements: Grand Unified Scheme (GUS)22-Dec 2014View >>
CLNR-L250Cost Analysis Report: Enhanced Automatic Voltage Control22-Dec 2014View >>
CLNR-L251Costs Analysis Report: Grand Unified Scheme (GUS)22-Dec 2014View >>
CLNR-L252Costs Analysis Report: Real Time Thermal Rating22-Dec 2014View >>
CLNR-L249Cost Analysis Report: Electrical Energy Storage22-Dec 2014View >>
CLNR-L131CLNR Trial Analysis: Real Time Thermal Rating for Underground Cables21-Dec 2014View >>
CLNR-L253ESOF Good Practice Guide on Electrical Energy Storage19-Dec 2014View >>
CLNR-L120CLNR Trial Analysis: EES2 and EES3 + GUS Powerflow Management19-Dec 2014View >>
CLNR-L210Technical recommendation for the purchase of EAVC for HV-LV systems19-Dec 2014View >>
CLNR-L209Technical recommendation for the purchase of EAVC for HV systems19-Dec 2014View >>
CLNR-L147Technical recommendation for the purchase of Electrical Energy Storge systems19-Dec 2014View >>
CLNR-L154Technical recommendation for the purchase of Active Network Management systems19-Dec 2014View >>
Document Snapshot Document Title View Document
This document presents the trial analysis results for the CLNR industrial and commercial customer demand side response trials.CLNR Trial Analysis: I&C DSR for Powerflow ManagementView >>
CLNR trial analysis document examining RTTR for power transformersCLNR Trial Analysis: RTTR for Secondary TransformersView >>
The work detailed in this report has been conducted using the models of Mortimer Road, Denwick HV network and Wooler Bridge LV network to evaluate the capability of these networks to accommodate low carbon technologies following deployment of tapchanging HV/LV transformers.CLNR Trial Analysis: Tapchanging Secondary Transformer Automonous and GUS Voltage ControlView >>
The report details findings from the HV and EHV overhead line RTTR trials from the Customer-Led Network project.CLNR Trial Analysis: EHV and HV for Real Time Thermal Rating TrialsView >>
This document describes the approach, methods and functionality of the NPADDS prototypeNPADDS Prototype Functionality and Benefits CaseView >>
This document details the requirements of a Business As Usual (BAU) ready version of the NPADDS software tool that was prototyped as part of the CLNR project.NPADDS Enduring SpecificationView >>
Operational guidance and training requirements associated with the trial of battery Electrical Energy Storage systemsOperational Guidance and Training Requirements: Electrical Energy Storage SystemsView >>
Operational guidance and training requirements associated with the trial of secondary transformers equipped with an integral on load tap changer.Operational Guidance and Training Requirements: Trials of Secondary Transformers with Integral OLTCView >>
Operational guidance and training requirements associated with network trials using the Grand Unified Scheme (GUS)Operational Guidance and Training Requirements: Grand Unified Scheme (GUS)View >>
The following report is a detailed breakdown of costs attributed to the design, modification and installation of the voltage control systems applied across the Northern Powergrid network.Cost Analysis Report: Enhanced Automatic Voltage ControlView >>
The following report is a detailed breakdown of costs attributed to the design, modification and installation of the active network management system that has been configured for the CLNR project named GUS (Grand Unified Scheme).Costs Analysis Report: Grand Unified Scheme (GUS)View >>
This report is a detailed breakdown of costs attributed to the design, modification and installation of thermal monitoring systems deployed for the CLNR projectCosts Analysis Report: Real Time Thermal RatingView >>
This report shows a breakdown of the costs attributed to the fleet of battery systems as deployed at six of Northern Powergrid's substations on the CLNR project.Cost Analysis Report: Electrical Energy StorageView >>
This report details findings from the underground cable RTTR trials carried out as part of the CLNR projectCLNR Trial Analysis: Real Time Thermal Rating for Underground CablesView >>
A link to the Energy Storage Operator Forum's Good Practice Guide on Electrical Energy Storage, features contributions from the CLNR projectESOF Good Practice Guide on Electrical Energy StorageView >>
This document details work conducted using the IPSA2 models of the Denwick network to evaluate the capability of the Denwick network in accommodating low carbon technologies following the deployment of EES2 and EES3 (100kVA,/200kWh & 50kVA/100kWh). This has been achieved using validated network models and a combination of real and synthesised load and generation data.CLNR Trial Analysis: EES2 and EES3 + GUS Powerflow ManagementView >>
A technical recommendation from the CLNR project for the purchase of Enhanced Automatic Voltage Control for HV-LV systemsTechnical recommendation for the purchase of EAVC for HV-LV systemsView >>
A technical recommendation from the CLNR project for the purchase of Enhanced Automatic Voltage Control for HV systemsTechnical recommendation for the purchase of EAVC for HV systemsView >>
A technical recommendation from the CLNR project for the purchase of Electrical Energy Storage systemsTechnical recommendation for the purchase of Electrical Energy Storge systemsView >>
A technical recommendation from the CLNR project for the purchase of Active Network Management systemsTechnical recommendation for the purchase of Active Network Management systemsView >>

1 2 3 4 5 6 7 8 9 10 11