Document Number Document Title Date View Document
CLNR-L220 Overview of Network Flexibility Trial Design for CLNR 24-Dec 2014 View >>
CLNR-L117 CLNR Trial Analysis: I&C DSR for Powerflow Management 23-Dec 2014 View >>
CLNR-L130 CLNR Trial Analysis: RTTR for Secondary Transformers 23-Dec 2014 View >>
CLNR-L126 CLNR Trial Analysis: Tapchanging Secondary Transformer Automonous and GUS Voltage Control 23-Dec 2014 View >>
CLNR-L127 CLNR Trial Analysis: EHV and HV for Real Time Thermal Rating Trials 23-Dec 2014 View >>
CLNR-L255 NPADDS Prototype Functionality and Benefits Case 23-Dec 2014 View >>
CLNR-L155 NPADDS Enduring Specification 23-Dec 2014 View >>
CLNR-L161 Operational Guidance and Training Requirements: Electrical Energy Storage Systems 22-Dec 2014 View >>
CLNR-L158 Operational Guidance and Training Requirements: Trials of Secondary Transformers with Integral OLTC 22-Dec 2014 View >>
CLNR-L156 Operational Guidance and Training Requirements: Grand Unified Scheme (GUS) 22-Dec 2014 View >>
CLNR-L250 Cost Analysis Report: Enhanced Automatic Voltage Control 22-Dec 2014 View >>
CLNR-L251 Costs Analysis Report: Grand Unified Scheme (GUS) 22-Dec 2014 View >>
CLNR-L252 Costs Analysis Report: Real Time Thermal Rating 22-Dec 2014 View >>
CLNR-L249 Cost Analysis Report: Electrical Energy Storage 22-Dec 2014 View >>
CLNR-L131 CLNR Trial Analysis: Real Time Thermal Rating for Underground Cables 21-Dec 2014 View >>
CLNR-L253 ESOF Good Practice Guide on Electrical Energy Storage 19-Dec 2014 View >>
CLNR-L120 CLNR Trial Analysis: EES2 and EES3 + GUS Powerflow Management 19-Dec 2014 View >>
CLNR-L210 Technical recommendation for the purchase of EAVC for HV-LV systems 19-Dec 2014 View >>
CLNR-L209 Technical recommendation for the purchase of EAVC for HV systems 19-Dec 2014 View >>
CLNR-L147 Technical recommendation for the purchase of Electrical Energy Storge systems 19-Dec 2014 View >>
Document Snapshot Document Title View Document
A review of active network/smart grid trial design and existing relevant active network management trials and pilot programs Overview of Network Flexibility Trial Design for CLNR View >>
This document presents the trial analysis results for the CLNR industrial and commercial customer demand side response trials. CLNR Trial Analysis: I&C DSR for Powerflow Management View >>
CLNR trial analysis document examining RTTR for power transformers CLNR Trial Analysis: RTTR for Secondary Transformers View >>
The work detailed in this report has been conducted using the models of Mortimer Road, Denwick HV network and Wooler Bridge LV network to evaluate the capability of these networks to accommodate low carbon technologies following deployment of tapchanging HV/LV transformers. CLNR Trial Analysis: Tapchanging Secondary Transformer Automonous and GUS Voltage Control View >>
The report details findings from the HV and EHV overhead line RTTR trials from the Customer-Led Network project. CLNR Trial Analysis: EHV and HV for Real Time Thermal Rating Trials View >>
This document describes the approach, methods and functionality of the NPADDS prototype NPADDS Prototype Functionality and Benefits Case View >>
This document details the requirements of a Business As Usual (BAU) ready version of the NPADDS software tool that was prototyped as part of the CLNR project. NPADDS Enduring Specification View >>
Operational guidance and training requirements associated with the trial of battery Electrical Energy Storage systems Operational Guidance and Training Requirements: Electrical Energy Storage Systems View >>
Operational guidance and training requirements associated with the trial of secondary transformers equipped with an integral on load tap changer. Operational Guidance and Training Requirements: Trials of Secondary Transformers with Integral OLTC View >>
Operational guidance and training requirements associated with network trials using the Grand Unified Scheme (GUS) Operational Guidance and Training Requirements: Grand Unified Scheme (GUS) View >>
The following report is a detailed breakdown of costs attributed to the design, modification and installation of the voltage control systems applied across the Northern Powergrid network. Cost Analysis Report: Enhanced Automatic Voltage Control View >>
The following report is a detailed breakdown of costs attributed to the design, modification and installation of the active network management system that has been configured for the CLNR project named GUS (Grand Unified Scheme). Costs Analysis Report: Grand Unified Scheme (GUS) View >>
This report is a detailed breakdown of costs attributed to the design, modification and installation of thermal monitoring systems deployed for the CLNR project Costs Analysis Report: Real Time Thermal Rating View >>
This report shows a breakdown of the costs attributed to the fleet of battery systems as deployed at six of Northern Powergrid's substations on the CLNR project. Cost Analysis Report: Electrical Energy Storage View >>
This report details findings from the underground cable RTTR trials carried out as part of the CLNR project CLNR Trial Analysis: Real Time Thermal Rating for Underground Cables View >>
A link to the Energy Storage Operator Forum's Good Practice Guide on Electrical Energy Storage, features contributions from the CLNR project ESOF Good Practice Guide on Electrical Energy Storage View >>
This document details work conducted using the IPSA2 models of the Denwick network to evaluate the capability of the Denwick network in accommodating low carbon technologies following the deployment of EES2 and EES3 (100kVA,/200kWh & 50kVA/100kWh). This has been achieved using validated network models and a combination of real and synthesised load and generation data. CLNR Trial Analysis: EES2 and EES3 + GUS Powerflow Management View >>
A technical recommendation from the CLNR project for the purchase of Enhanced Automatic Voltage Control for HV-LV systems Technical recommendation for the purchase of EAVC for HV-LV systems View >>
A technical recommendation from the CLNR project for the purchase of Enhanced Automatic Voltage Control for HV systems Technical recommendation for the purchase of EAVC for HV systems View >>
A technical recommendation from the CLNR project for the purchase of Electrical Energy Storage systems Technical recommendation for the purchase of Electrical Energy Storge systems View >>