Dataset: Distribution Substation, Electrical Energy Storage 100kVA 200kWh Autonomous Powerflow Management Trial
Overview
This dataset forms part of a comprehensive set of results derived from the CLNR project’s network technology trials. The data is presented in an open and useable format. Use the button oppostite to download and save the file.
Description: | Network data trials showing performance of Electrical Energy Storage EES2 – 100kVA/200kWh being used for power flow management. |
Purpose: | To ensure the dataset from EES2 network trials is shared with other DNOs and interested parties. This dataset also supports the VEEEG analysis and reports produced by Newcastle University. EES2 Autonomous Powerflow Management |
Site Location/s: | High Northgate Substation |
Network Type: | Urban |
Data Source: | Flexible Data Warehouse & Historian Trial length: 5 days (14/06/2014 – 18/06/2014) |