Cost Analysis Report: Electrical Energy Storage

Overview

This report shows a breakdown of the costs attributed to the fleet of battery systems as deployed at six of Northern Powergrid’s substations on the CLNR project.

The costs consist of the combination of equipment and resources deployed on the Rise Carr 2.5MVA/5MWh battery, the two 100kVA/200kWh systems at High Northgate and Wooler Ramsey, and the three 50kVA/100kWh systems at Harrowgate Hill, Wooler St Mary and Elgar Drive.